Wednesday, 14 December 2016

week 24
Figure 1: Green LED was install as an indicator 

Figure 2: construct the panel box for reading output of the three renewable energy wind,solar and hydro.


VIDEO : digital panel meter


week 23
Figure 1: The design of wind turbine with replaced source using 12v fan.

week 22
Figure 1: construct the Pv Solar panel station with replaced source of 12v heat lamp.


week 21
Figure 1: construct the hydro turbine model

Figure 2: The blade for hydro turbine was install inside, this will make it easier to spin according to the speed adjusted for water pressure. 12 Vdc motor was install at the outside of the case to prevent it to be exposed to water splash.
VIDEO: the design of hydro turbine are followed in the video as the reference.
Week 20

Figure 1: system troubleshoot for solar, hydro and wind

figure 2: Updated connection diagram for renewable energy trainer

Figure 3: second design for this project

*noted that the second design is the latest design for the renewable energy trainer.


Week 19

Design the project

Figure 1: First design of renewable energy trainer

figure 2: The combination of the three renewable energy

week 18
  All component are safely arrived. 


*Designing the project.

figure 1: paper draft for solar station

Figure 2: paper draft for wind station

Figure 3: paper draft for hydro station