Wednesday 1 June 2016

week 11

BLOCK DIAGRAM



the block diagram of the renewable energy trainer operation. There are 4 important parts in the block diagram that is the input of resource that is 12v spotlight, 12v fan and 12v water pump that was applied with power supply. The 3 component give input to each renewable energy panel. The input was detect by each panel and sent to inverter as to invert DC to AC. Lastly, the 7 segments display the output measurement in voltage and current parameters. 

No comments:

Post a Comment